A bathroom and kitchen refurbushment frenzy at Roundhouse Barns

Yep…  we’ve bitten the bullet.  We’ve decided that much as we enjoy the company of our friendly builders every winter, this one will be the last….  sorry Justin and the crew at Concept Bathrooms!

We’ve decided to accelerate our refurbishment plans.  In November, both B&B bathrooms are to be replaced.  We’re taking the opportunity to enlarge The Fal bathroom as well by nicking a bit out of the bedroom.  It will make sitting on the throne a less intimate experience.  The Minack will have a swanky new walk in shower with a glass wall dividing it from the basin.   We’re still debating whether to go for under-floor heating.  Is this something that would appeal or is it an unnecessary extravagance?  Please let us know.

We’ll start 2010 with a parade of waste skips – four we reckon at present…  Why?   Well, we’re going to rip out all our self catering kitchens and bathrooms.  Steve (or “Taz” as he is known to the Concept Bathrooms team) will be in his element ripping it all out.  We’re taking bets on whether it will take him one or two days to rip it all out.

And then the transformation happens – read the news item on our website for more details.  In summary, we’re replacing every kitchen and bathroon in our self catering cottages.  We do REALLY REALLY want to involve our guests in designing the kitchens and bathrooms,  What do you want, what should we avoid?  Feel free to add to this blog.

In anticipation…..